Construction

Blackwall Reach
Mechanical & Electrical
Working on behalf of Merit and with Eon as the end user the Blackwall Reach project was a prestige commercial development in the city of London, Blackwall consisting of 3 high rise private and council blocks of properties.
I was tasked to deliver the full design, build and commissioning working alongside Merit's engineering and procurement teams. The project consisted of supplying a plant room to deliver water to the properties.

Harrods
Mechanical & Electrical
Delivering the project for a prestige end user the Harrods transformer upgrade project involved the supply of a new transformer package to replace Harrods then current old transformer.
The project consisted of all project management including supply of materials, transformers, cable, room build and labour needed to ensure a successful project. The Harrods transformer upgrade was particularly challenging due to switching over the equipment whilst maintaining zero downtime and with only a two hour window.

Rolls Royce
Mechanical & Electrical
Acting as the principal contractor, working on behalf of Merit and supplying to the end user Rolls Royce. Working with Merits commercial, design and procurement team I was tasked to supply project management services to deliver an M&E project including HVAC, partitions and specialist flooring to Rolls Royce to double their manufacturing output. The project was delivered in a live environment.

Rolls Royce TSTL
Mechanical & Electrical
Working with a pre fabricated building that had previously been stripped to an empty shell the Rolls Royce TSTL project was a complicated time constrained project. Working as the principal contractor managing the full project lifecycle, design, procurement, site set-up, installation, commercial, planning and commissioning, I delivered the project along side Merits design, procurement and labour teams.
Rolls Royce TSTL was a complex delivery package consisting of Civils internal and external, steel fixing, M&E, off site fabrication, HVAC, supply and extract ducting, gas detection, sprinklers, gasses, lighting, compressed air and effluent treatment.

Viridor waste management
Mechanical & Electrical
Working under the principal contractor and supplying all resource to complete the electrical and C&I installation. Working under Merit, with Interserve and the end user being Viridor.
I had the task of managing the site teams in line with Interserves policies to co ordinate the works with over 100 operatives on site installing DB's, pulling cables, glanding & terminating, testing and installing the necessary instruments.

SGS Vitrology
Pharmaceutical & Clean Room
Acting as the principal contractor and supplying a clean room project with full design and build responsibility for a viral testing facility. Working under Merit and with the end user SGS Vitrology.
I managed the full site install alongside Merit construction managers. With a high emphasis on quality the install included civils, walls, partitions, ceilings, flooring, HVAC and M&E.

UK BIC
Pharmaceutical & Clean Room
Working under Merit, in conjunction with a large M&E contractor to design and build, off site fabricate, install and commission multiple clean and dry rooms to enable client machines to operate in.
Working in a newly built bare battery manufacturing facility and working alongside the Principal contractor, the scope included to fully design and build, install sealed partitions, HVAC, M&E and de-humidifiers to enable a -50 dew point and temperature control.